Why this matters
The most important decisions happen before design begins.
By the time architectural drawings are underway, many of the decisions that shape a home’s long-term health are already locked in: enclosure, materials, mechanical systems, even the site orientation. Changing them later means costly redesigns or, worse, a home that doesn’t perform the way it should.
The Healthy + Longevity Home Roadmap helps you make those early decisions with confidence, grounded in building science, not aesthetics trends.

Who this is for
This roadmap is for you if…
- You’re planning a $1.5M+ build, renovation, or healthy-home retrofit.
- You’re early enough in the process that decisions can still be influenced.
- You care about non-toxic materials, indoor air quality, mold resilience, and EMF-aware design.
- You want a home that supports longevity, performance, and human thriving, not just aesthetics.
Created by SENERGY360
Brian Johnson is the only General Contractor in the country with a triple certification from the Building Biology Institute. For more than two decades he’s built mass-wall, low-toxicity homes designed to support health, longevity, and resilience, from the Sanctuary House in Catalina, Arizona to consulting engagements across the United States.
From first meeting to signed contract
Preconstruction Process
SENERGY360 has developed a methodical approach to preconstruction grounded in building science. What happens intentionally during design (material choices, enclosure decisions, mechanical systems) sets the foundation for a home that supports long-term health and longevity.
We’re a one-stop shop. Architecture, interior design, building science, and construction live under one roof, so your project stays aligned from the first sketch to the final detail, with no hand-offs or finger-pointing between disciplines.
Before we break ground, our in-house team works alongside you to shape a scope that reflects your investment priorities and longevity goals. Some clients want every detail; others prefer to trust the structure and stay focused on the bigger picture. Either way, we guide the journey from early exploration through design development, budgeting, and contract readiness, so construction begins with clarity, not surprises.
Timeline at a glance
Preconstruction Timeline
- 01
Client Introduction & Exploration Meeting
Duration · 60–90 minutes
Align on health priorities, longevity goals, investment, and project fit.
→ Review sample Preconstruction Services Agreement.
- 02
Sign Preconstruction Services Agreement
Duration · Throughout the design phase
Engage SENERGY360, your architect, interior designer, and build team, for the full design phase, all under one roof.
→ Your in-house design team begins concept work.
- 03
Site Meeting with Owner & In-House Design Team
Duration · 60–90 minutes
Walk the site with your SENERGY360 architect, interior designer, and build lead; align on feasibility, building-science requirements, and communication.
- 04
Integrated Design Development
Duration · Pace set by client, typically several months
Architecture, interior design, building-science input, non-toxic material vetting, and pricing guidance, all coordinated by a single in-house team, so decisions stay aligned and trade-offs are visible in real time.
→ Preliminary pricing; advance into construction documents.
- 05
Permit Acquisition
Duration · Varies by jurisdiction
Submit and secure required permits while design work continues.
- 06
Completion of Construction Documents & Finishes Schedules
Duration · Pace set by client, typically several months
Our in-house architecture and interior design teams produce detailed, buildable drawings and selections, including non-toxic material specifications and mechanical strategy.
→ Confirm CD set is ready for Trade Walk.
- 07
Trade Walk
Duration · 4–8 hours (plus ~2 weeks for trade proposals)
Trade partners review drawings and site, identify challenges, and generate proposals.
- 08
Post Trade Walk Consultation
Duration · 1–2 hours
Address new details uncovered during the walk; confirm scope implications.
- 09
Value Engineering / Phasing (After Trade Walk, if needed)
Duration · Varies
Adjust scope in response to trade input, protecting healthy-build essentials and keeping the project in target range.
- 10
Construction Budgets
Duration · ~3 weeks after Trade Walk
Prepare a transparent cost-plus budget (or consider fixed price).
- 11
Value Engineering / Phasing (After Budgets, if needed)
Duration · Varies
Align final scope with investment goals once budget is clear, without compromising health-driven priorities.
- 12
Finalize Drawings & Selections
Duration · Varies by revisions
Update drawings and finishes schedules after VE / phasing.
→ Lock scope with final drawings.
- 13
Sign Construction Contract
Duration · Usually ≥2 weeks before construction starts
Secure schedule, coordinate trades, materials, and permits.
→ Transition into construction.
You don’t need to manage this process. We will. Whether you want to stay close to the details or simply trust the structure, we’ll guide the journey.
Let’s talk about your vision
We build a limited number of homes and renovations each year, projects defined by care, clarity, and shared values. We don’t just build legacy homes or high-end renovations. We build the conditions for life to thrive.